HomePage About Us Contact Us Where we are Stop-Sand Drilling Rigs Special Jobs Tukhman Camp


Hajjan Drilling Est. is a 100% Saudi Establishment owned by Mr. Mohammad Hamzah Hajjan

Hajjan Drilling Est. started to operate in Dammam on 1976 under the management of Mr. Mario Rescia.

Since then we have drilled more than 1000 water wells all over Saudi Arabia, and carried out more than 100 workovers.

Also quite consistent is our overseas experience with Water Well Drilling Projects executed by ourselves or in Joint Venture in Italy, Iraq, Sudan, Bahrain, Senegal, Gambia, Cape Verde Islands and Mauritania. 

Our most important employers are ARAMCO,SINO SAUDI GAS, LUKSAR,SRAK, ENIREPSA and the Ministry of  Water and Electricity (MOWE), although we also cooperate with other public institutions, as the SAUDI FUNDS, and private firms.

A substantial part of our work has been executed in the Rub' Al Khali desert; this includes the drilling of about 40 new water wells with depth ranging from 100 m to 1,200 m, 65 workovers of old wells and also topographic survey for Geophysics and Oil Wells.

Naturally, during all these years, we have accumulated an extremely valuable experience and collected a large amount of important data; our Know-how is hence at disposal of anyone who needs to work in the R.A.K. desert, particularly for Gas exploration Project.

The core of our business is the Drilling of Water Wells with any design and specifications, but, in addition, we can also offer special jobs as Air Foam drilling, Gravel Pack installation by means of our STOP-SAND Liner Hanger Packer (worldwide patented),and retrieval and installation of Electrical Submersible and Line Shaft Pumps.

Further we can offer the following consultancy Services:

1. Information on morphology of determined areas
2. Information on transportation routes (distance, degree of difficulty)
3. Advice on best suitable vehicles for desert travel or transportation
4. Cost estimations for water well drilling, access roads and well sites
5. Geological information for water well drilling
6. Well design and specifications according to ARAMCO's and MOWE's Standards.

All our activities, which involve about 300 people and a fleet of 13 rigs, with 24 hours work coverage, are directed from our Head Office in Sihat (25,000 m² yard).
Quite important is also our desert base camp in the South (Tukhman – N 22° 10', E 49° 40'), from which all the Rub' Al Khali projects are logistically supported.


Contact us for more information on our activities.